General Information
| Completion: | 30 October 2012 |
|---|---|
| Status: | in use |
Project Type
| Function / usage: |
Metro (Subway, Underground) Line |
|---|
Location
| km | Name |
Technical Information
Dimensions
| number of tracks | 2 | |
| number of stations | 20 | |
| track length | 25.100 km | |
| track gauge | 1 435 mm | |
| total length | 24.110 km |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- (2011): Experimental Design Validation of a "W" Girder Used for the Construction of Mexico City Transportation System. Presented at: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011.
- (2019): Monitoring and Identification of Vibration Frequencies on a Portion of México City Metro Line 12. In: Advances in Civil Engineering, v. 2019 ( 2019), pp. 1-13.
- About this
data sheet - Structure-ID
10057498 - Published on:
13/08/2010 - Last updated on:
16/12/2024


