{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,16]],"date-time":"2025-10-16T06:52:30Z","timestamp":1760597550729},"reference-count":20,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2013,4,19]],"date-time":"2013-04-19T00:00:00Z","timestamp":1366329600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2014,4]]},"DOI":"10.1007\/s12351-013-0134-5","type":"journal-article","created":{"date-parts":[[2013,4,18]],"date-time":"2013-04-18T03:38:37Z","timestamp":1366256317000},"page":"29-50","source":"Crossref","is-referenced-by-count":15,"title":["Lot sizing in a deteriorating production system under inspections, imperfect maintenance and reworks"],"prefix":"10.1007","volume":"14","author":[{"given":"T.","family":"Chakraborty","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"B. C.","family":"Giri","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2013,4,19]]},"reference":[{"key":"134_CR1","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1016\/S0925-5273(01)00168-2","volume":"76","author":"M Ben-Daya","year":"2002","unstructured":"Ben-Daya M (2002) The economic production lot sizing problem with imperfect production process and imperfect maintenance. Int J Prod Econ 76:257\u2013264","journal-title":"Int J Prod Econ"},{"key":"134_CR2","doi-asserted-by":"crossref","first-page":"515","DOI":"10.1016\/j.cor.2005.03.011","volume":"34","author":"U Buscher","year":"2007","unstructured":"Buscher U, Lindner G (2007) Optimizing a production system with rework and equal sized batch shipments. Comput Oper Res 34:515\u2013535","journal-title":"Comput Oper Res"},{"key":"134_CR3","doi-asserted-by":"crossref","first-page":"606","DOI":"10.1016\/j.ejor.2007.01.011","volume":"185","author":"T Chakraborty","year":"2008","unstructured":"Chakraborty T, Giri BC, Chaudhuri KS (2008) Production lot sizing with process deterioration and machine breakdown. Eur J Oper Res 185:606\u2013618","journal-title":"Eur J Oper Res"},{"key":"134_CR4","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1016\/j.omega.2006.12.001","volume":"37","author":"T Chakraborty","year":"2009","unstructured":"Chakraborty T, Giri BC, Chaudhuri KS (2009) Production lot sizing with process deterioration and machine breakdown under inspection schedule. Omega 37:257\u2013271","journal-title":"Omega"},{"issue":"3-4","key":"134_CR5","doi-asserted-by":"crossref","first-page":"535","DOI":"10.1016\/j.mcm.2006.11.031","volume":"46","author":"SW Chiu","year":"2007","unstructured":"Chiu SW, Ting CK, Chiu YSP (2007) Optimal production lot sizing with rework, scrap rate and service level constraint. Math Comput Model 46(3\u20134):535\u2013549","journal-title":"Math Comput Model"},{"key":"134_CR6","doi-asserted-by":"crossref","first-page":"423","DOI":"10.1002\/(SICI)1520-6750(199806)45:4<423::AID-NAV8>3.0.CO;2-7","volume":"45","author":"M Hariga","year":"1998","unstructured":"Hariga M, Ben-Daya M (1998) Economic manufacturing lot sizing problem with imperfect manufacturing process: bounds and optimal solutions. Nav Res Logis 45:423\u2013433","journal-title":"Nav Res Logis"},{"issue":"6","key":"134_CR7","doi-asserted-by":"crossref","first-page":"584","DOI":"10.1080\/095372801750397707","volume":"12","author":"PA Hayek","year":"2001","unstructured":"Hayek PA, Salameh MK (2001) Production lot sizing with the reworking of imperfect quality items produced. Prod Plan Control 12(6):584\u2013590","journal-title":"Prod Plan Control"},{"key":"134_CR8","doi-asserted-by":"crossref","first-page":"1595","DOI":"10.1016\/j.cor.2004.11.009","volume":"33","author":"K Inderfurth","year":"2006","unstructured":"Inderfurth K, Janiak A, Kovalyov MY, Werner F (2006) Batching work and rework processes with limited deterioration of reworkables. Comput Oper Res 33:1595\u20131605","journal-title":"Comput Oper Res"},{"key":"134_CR9","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1016\/j.cie.2004.03.001","volume":"47","author":"AAM Jamal","year":"2004","unstructured":"Jamal AAM, Sarkar BR, Mondal S (2004) Optimal manufacturing batch size with rework process at a single-stage production system. Comput Ind Eng 47:77\u201389","journal-title":"Comput Ind Eng"},{"key":"134_CR10","first-page":"421","volume":"33","author":"CH Kim","year":"2001","unstructured":"Kim CH, Hong Y, Chang SY (2001) Optimal production run length and inspection schedules in a deteriorating production process. IIE Trans 33:421\u2013426","journal-title":"IIE Trans"},{"key":"134_CR11","doi-asserted-by":"crossref","first-page":"1125","DOI":"10.1287\/mnsc.33.9.1125","volume":"33","author":"HL Lee","year":"1987","unstructured":"Lee HL, Rosenblatt MJ (1987) Simultaneous determination of production cycle and inspection schedules in a production system. Manag Sci 33:1125\u20131136","journal-title":"Manag Sci"},{"key":"134_CR12","doi-asserted-by":"crossref","first-page":"775","DOI":"10.1057\/jors.1991.148","volume":"42","author":"JS Lee","year":"1991","unstructured":"Lee JS, Park KS (1991) Joint determination of production cycle and inspection intervals in a deteriorating production system. J Oper Res Soc 42:775\u2013783","journal-title":"J Oper Res Soc"},{"key":"134_CR13","volume-title":"Introduction to engineering","author":"EE Lewis","year":"1996","unstructured":"Lewis EE (1996) Introduction to engineering. Wiley, New York"},{"issue":"2","key":"134_CR14","first-page":"73","volume":"8","author":"TM Lin","year":"1991","unstructured":"Lin TM, Tseng ST, Liou MJ (1991) Optimal inspection schedule in the imperfect production system under general shift distribution. J Chin Inst Ind Eng 8(2):73\u201381","journal-title":"J Chin Inst Ind Eng"},{"key":"134_CR15","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1080\/07408179408966595","volume":"26","author":"MJ Liou","year":"1994","unstructured":"Liou MJ, Tseng ST, Lin TM (1994) The effects of inspection errors to the imperfect EMQ model. IIE Trans 26:42\u201351","journal-title":"IIE Trans"},{"key":"134_CR16","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1287\/opre.34.1.137","volume":"34","author":"EL Porteus","year":"1986","unstructured":"Porteus EL (1986) Optimal lot sizing, process quality improvement and setup cost reduction. Oper Res 34:137\u2013144","journal-title":"Oper Res"},{"key":"134_CR17","doi-asserted-by":"crossref","first-page":"48","DOI":"10.1080\/07408178608975329","volume":"18","author":"MJ Rosenblatt","year":"1986","unstructured":"Rosenblatt MJ, Lee HL (1986a) Economic production cycles with imperfect production process. IIE Trans 18:48\u201355","journal-title":"IIE Trans"},{"key":"134_CR18","doi-asserted-by":"crossref","first-page":"2","DOI":"10.1080\/07408178608975323","volume":"18","author":"MJ Rosenblatt","year":"1986","unstructured":"Rosenblatt MJ, Lee HL (1986b) A comparative study of continuous and periodic inspection policies in deteriorating production system. IIE Trans 18:2\u20139","journal-title":"IIE Trans"},{"key":"134_CR19","doi-asserted-by":"crossref","first-page":"687","DOI":"10.1080\/15458830.1996.11770713","volume":"28","author":"ST Tseng","year":"1996","unstructured":"Tseng ST (1996) Optimal preventive maintenance policy for deteriorating production system. IIE Trans 28:687\u2013694","journal-title":"IIE Trans"},{"key":"134_CR20","doi-asserted-by":"crossref","first-page":"191","DOI":"10.1016\/S0925-5273(98)00059-0","volume":"55","author":"ST Tseng","year":"1998","unstructured":"Tseng ST, Yeh RH, Ho WT (1998) Imperfect maintenance policies for deteriorating production systems. Int J Prod Econ 55:191\u2013201","journal-title":"Int J Prod Econ"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-013-0134-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s12351-013-0134-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-013-0134-5","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T04:04:35Z","timestamp":1559448275000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s12351-013-0134-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,4,19]]},"references-count":20,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2014,4]]}},"alternative-id":["134"],"URL":"https:\/\/doi.org\/10.1007\/s12351-013-0134-5","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"value":"1109-2858","type":"print"},{"value":"1866-1505","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,4,19]]}}}