Madhya Pradesh Power Generation Company Limited

From Wikipedia, the free encyclopedia

Madhya Pradesh Power Generating Company Limited
TypeGovernment-owned Corporation-PSU
IndustryElectricity generation
FoundedThe Company was incorporated on 22.11.2001 & started functioning independently from 01-06-2005
HeadquartersJabalpur, Madhya Pradesh, India
Area served
State of Madhya Pradesh, India
Key people
Shri Sanjay Dubey (chairman)
Shri Manjeet Singh (managing director)
ServicesElectricity Generation
OwnerGovernment of Madhya Pradesh (100%)
Number of employees
4878
Websitewww.mppgcl.mp.gov.in

M.P. Power Generating Company Limited (MPPGCL) is the electricity generation company of the Government of Madhya Pradesh state in India.

Generation capacity

[edit]

The installed capacity of MPPGCL as on 01.01.2019 is 6315 MW out of which madhya pradesh share is about 6312.50 MW.[1]

PLF (%) Last 10 Years
Years ATPS STPS SGTPS SSTPP Overall
2009-10 45.89% 64.57% 65.99% N.A. 62.86%
2010-11 48.66% 60.51% 65.78% N.A. 61.10%
2011-12 54.66% 53.68% 70.20% N.A. 61.38%
2012-13 71.66% 55.26% 73.52% N.A. 66.24%
2013-14 74.3% 48.0% 67.8% N.A. 60.0%
2014-15 53.3% 52.9% 58.1% 26.23% 49.6%
2015-16 96.8% 47.2% 59.9% 40.4% 51.2%
2016-17 80.51% 31.28% 58.53% 23.54% 40.49%
2017-18 93.94% 43.09% 64.26% 35.90% 50.55%
2018-19 88.9% 64.1% 74.0% 61.1% 67.3%

Power stations

[edit]

Thermal power stations coal based

[edit]
Sr.NoProjectCapacity (in M.W.)Unit MWStatusEPC Contractor (TG set and Boiler make)
1Satpura Thermal Power Station5002x250 MWConstruction of proposed 1x660 MW unit is yet to startBHEL
2Amarkantak Thermal Power Station2101×210 MWAll Unit Functional ,1x660 MW under surveyingBHEL
3Sanjay Gandhi Thermal Power Station13404×210 MW,1×500 MWAll Unit FunctionalBHEL (though ABL make boiler in 210MW units)
4Shree Singaji Thermal Power Station25202x600 MW, 2×660 MW (super critical)All Unit Functional.BHEL -600MW, L&T-MHPS-660MW

Total installed thermal capacity 5400 MW.

Hydel power stations

[edit]
Sr.NoPower StationInstalled CapacityM.P.ShareLocation / River
1Gandhi Sagar (5x23 MW)11557.5Distt. Mandsour / Chambal River
2Pench, Totladoh (2x80 MW)160107Distt. Nagpur / Pench River
3Rani Awanti Bai Bargi (2x45 MW)9090Bargi, Distt. Jabalpur / Narmada River
4Rajghat (3x15 MW)4522.5Rajghat, Distt. Ashoknagar / Betwar River
5Birsinghpur (1x20 MW)2020Birsingpur, Distt. Umariya / Johila River
6Ban Sagar I Tons (3x105 MW)315315Sirmour, Distt. Rewa Beehar River
7Ban Sagar II Silpara (2x15 MW)3030Silpara, Distt. Rewa / Cana
8Bansagar -III Deolond (3x20 MW)6060Deolond, Distt. Shahdol / Sone River
9Bansagar -IV Jhinna (2x10 MW)2020Jhinna, Distt. Satna / Jhinna Dyke
10Madhikheda (3x20 MW)6060Madhikheda, Distt. Shivpuri / Kalisindh River
Total1186917.5

Two proposed Hydel unit at Chhindwara (2x45MW) and Murena (270 MW)