If you can address this concern by improving, copyediting, sourcing, renaming, redirecting, or merging the page, please edit this page and do so. You may remove this message if you improve the article or otherwise object to deletion for any reason. Although not required, you are encouraged to explain why you object to the deletion, either in your edit summary or on the talk page. If this template is removed, do not replace it. The article may be deleted if this message remains in place for seven days, i.e., after 03:27, 6 August 2026 (UTC). Find sources: "Path 62" – news · newspapers · books · scholar · JSTOR |
Path 62 or the Eldorado – McCullough 500 kV Line is a short, 0.6-mile (1 km), 500 kV power line linking Los Angeles Department of Water and Power's (LADWP's) McCullough substation to Southern California Edison's (SCE's) Eldorado substation in the Eldorado – Marketplace – McCullough substation complex just south of Boulder City, Nevada. Path 62 is part of The Western Electricity Coordinating Council's links of electrical intertie paths in the western United States. Like Path 61, this short-yet-important 500 kV line allows for power flow to be rerouted on different 500 kV lines that make up the massive Path 46 transmission system when necessary.[1] Power generated from Hoover Dam and other power plants in the southwestern United States is routed to this substation complex via many other 500 kV lines.[1][2]

Power transmission capacity
[edit]The 500 kV line can transmit 2,598 MVA (3,000 amps) of electrical power in either direction.[1]