Sengkang Depot
The administration building of the depot | |
![]() Interactive map of Sengkang Depot | |
| Location | |
|---|---|
| Location | 91 Sengkang East Avenue Singapore 545072 (NEL) 95 Sengkang East Avenue Singapore 545051 (LRT) |
| Coordinates | 01°23′20″N 103°53′06″E / 1.38889°N 103.88500°E |
| Characteristics | |
| Owner | Land Transport Authority |
| Operator | SBS Transit |
| Depot code | SKD |
| Type | At-grade (MRT) Elevated (LRT) |
| Roads | Sengkang East Avenue, Sengkang East Road |
| Rolling stock | Heavy rail: Alstom Metropolis C751A Alstom Metropolis C751C Alstom Metropolis C851E Light rail: Mitsubishi Crystal Mover (C810) Mitsubishi Crystal Mover (C810A) Mitsubishi Crystal Mover (C810D) |
| Routes served | NEL North East Line SKLRT Sengkang LRT line PGLRT Punggol LRT line |
| History | |
| Opened | 2003 |
Sengkang Depot is a train depot located in Sengkang, Singapore. It houses the trains of the North East Line (NEL) and the Sengkang and Punggol LRT lines,[a] as well as the control centre of the NEL. Located beside Tongkang LRT station, it was constructed in 1997 as part of the NEL and led to the relocation of two buildings. Expansion works, intended to accommodate additional LRT trains and enhance power supply systems, began in 2022 and are expected to be completed by 2027.
History
[edit]Sengkang Depot was constructed by Hyundai Engineering & Construction Co. in July 1997, at a contract sum of S$350 million.[2] To facilitate construction, two buildings, Pelangi Home and Puat Jit Temple, were moved to temporary locations and eventually relocated. A thousand lorries were needed to excavate the depot's area, which was government land previously inhabited by squatters. Due to the lack of roads available, the lorries had to cross over from the construction site of Sengkang Depot to the main road, moving through more treacherous paths as construction progressed. In total, 3 million m3 (110 million cu ft) of earth was excavated during construction.[3]
On 5 February 2021, the Land Transport Authority announced plans to expand the LRT depot from the existing 3.5 hectares (35,000 m2) to 11.1 hectares (111,000 m2). The expanded depot would provide increased stabling capacity, a new maintenance workshop, and two new reception tracks in anticipation for the procurement of 17 two-car trains to boost the Sengkang and Punggol LRT lines' capacity. In addition, the existing power supply systems would be enhanced and three new traction power stations would be added to the existing five for improved traction power to support the additional trains. Originally due to begin at the end of 2021,[4] expansion works began in 2022[5] and are scheduled to be completed by 2027.[4][5]
As part of expansion works, two contracts were awarded. The first contract, worth $439 million, was awarded to a consortium[b] for two-car trains, expansion works and a new signalling system for the expanded depot. The other contract, worth $157 million, was awarded to Sato Kogyo for expansion works only.[6]
Details
[edit]- LRT section of Sengkang Depot. The LRT rolling stocks are parked at the top level of the building.
- Two Alstom Metropolis C751A stocks stabled in Sengkang Depot, taken in November 2008.
Sengkang Depot is located beside Tongkang LRT station.[5] It covers 27 hectares (67 acres) and is split into two depots: an LRT depot at the top, and an MRT depot at the bottom.[7]
The MRT depot contains maintenance bays where an entire NEL train can be lifted up for repair works.[7] The depot also houses the Operations Control Centre (OCC) of the NEL,[8] where transit officers can monitor train and station operations on the NEL. They can communicate with passengers using the intercom to address any issues, instruct them on how to evacuate trains in times of emergency, and monitor trains via cameras. The OCC also has a single terminal that controls the entire automation of the NEL, granting officers full control of the NEL.[9]
The expanded LRT depot contains an additional maintenance workshop that allows both cars of a two-car train to be maintained simultaneously; the prior building accommodates one car at a time. It also contains a new test track; the existing one will be repurposed to connect the prior depot and the area created during expansion.[5]
Inside the depot is a substation which has two interconnected switchboards, each being a backup for the other.[10]
Notes
[edit]- ↑ LRT stands for Light Rail Transit.[1]
- ↑ Comprising Mitsubishi Corporation, Mitsubishi Heavy Industries Engineering and Mitsubishi Heavy Industries Asia Pacific.
References
[edit]- ↑ Yeap, Amanda (12 October 2024). "Is There Still Light at the End of the Tunnel for Singapore's Light Rail Transit System?". CNA. Archived from the original on 21 May 2026. Retrieved 28 June 2026.
- ↑ "LTA awards 5 more contracts for N-E MRT line". The Straits Times. 27 July 1997. p. 34. Retrieved 8 June 2026 – via NewspaperSG.
- ↑ Leong 2003, p. 202.
- 1 2 "Sengkang-Punggol LRT to get 17 new two-car trains to boost capacity". CNA. 5 February 2021. Archived from the original on 10 August 2021. Retrieved 10 August 2021.
- 1 2 3 4 Ong Guang-Xi, Justin (12 April 2026). "A first look at the expanded Sengkang-Punggol LRT depot". CNA. Archived from the original on 12 April 2026. Retrieved 28 June 2026.
- ↑ Lee, Nian Tjoe (15 February 2022). "LTA awards $596m contracts for trains and depot expansion on Sengkang-Punggol LRT system". The Straits Times. Archived from the original on 11 March 2026. Retrieved 26 May 2026.
- 1 2 Leong 2003, pp. 202–204.
- ↑ Leong 2003, p. 201.
- ↑ Leong 2003, p. 207.
- ↑ "NEL, Sengkang-Punggol LRT disruption: LTA, SBS Transit working to avoid repeat of rare 'double fault' scenario". CNA. 16 August 2025. Archived from the original on 18 December 2025. Retrieved 10 May 2026.
Bibliography
[edit]- Leong, Chan Teik (2003). Getting There: The Story of the North East Line. Singapore: Land Transport Authority. ISBN 981-04-5886-X. OCLC 53383062.